Terms of reference for the Bauxite Hills Project environmental impact statement : proposed by Aldoga Minerals Pty. Ltd. / prepared by: Impact Assessment Operational Support Unit, Department of Environment and Heritage Protection
- Bib ID:
- 8410554
- Format:
- Book
- Online Access:
- National edeposit
Broken link? let us search Trove , the Wayback Machine , or Google for you.
- Online Version:
-
- Online PDF report via catalogue
Broken link? let us search Trove , the Wayback Machine , or Google for you.
- Queensland Department of Environment and Heritage Protection
Broken link? let us search Trove , the Wayback Machine , or Google for you.
- Online PDF report via catalogue
- Related Online Resources:
- Thumbnail
Broken link? let us search Trove , the Wayback Machine , or Google for you.
- Access Conditions:
- National edeposit: Available online
- Description:
-
- Brisbane, Queensland : Department of Environment and Heritage Protection, 2016
- [Brisbane, Queensland] : Department of Environment and Heritage Protection, [2016]
- ©2016
- 1 online resource (iii, 24 pages)
- Technical Details:
- Available online (as at 16/03/16) at: https://www.ehp.qld.gov.au/management/impact-assessment/eis-processes/bauxite-hills-project.html.
- Summary:
-
These terms of reference outline the information requirements for the resource project being assessed under the EIS process. The Bauxite Hills Project would include an open cut operation, haul roads, barge loading facility, shipping and would produce and transport up to 5 million tonnes per annum of ore over approximately 12 years.
- Notes:
-
- Title from PDF cover page (viewed on March 16, 2016)
- "February 2016".
- Includes bibliographical references.
- Also available online (as at 16/03/16) at: https://www.ehp.qld.gov.au/management/impact-assessment/eis-processes/bauxite-hills-project.html.
- Subject:
- Other authors/contributors:
- Queensland. Department of Environment and Heritage Protection. Impact Assessment and Operational Support Unit, compiler
- Also Titled:
- Terms of reference for an environmental impact statement, Bauxite Hills Project
- Copyright:
-
In Copyright
You may copy under some circumstances, for example you may copy a portion for research or study. Order a copy through Copies Direct to the extent allowed under fair dealing. Contact us for further information about copying.
- Reason for copyright status:
- Until 2066 [Created/Published Date + 50 Years]
Copyright status was determined using the following information:
- Material type:
- Literary Dramatic Musical
- Published status:
- Published
- Publication date:
- 2016
Copyright status may not be correct if data in the record is incomplete or inaccurate. Other access conditions may also apply. For more information please see: Copyright in library collections.
Feedback
Similar items
- Environmental impact statement (EIS) assessment report under the Environmental Protection Act 1994 : Bauxite Hills Project proposed by Aldoga Minerals Pty Ltd (a wholly owned subsidiary of Metro Mining Limited) / prepared by: Impact Assessment and Operational Support, Department of Environment and Heritage Protection
- Bauxite Hills Project : initial advice statement / Metro Mining Limited
- Draft terms of reference for the Bauxite Hills Project Environmental impact statement : proposed by Aldoga Minerals Pty Ltd on behalf of Metro Mining Limited. / prepared by: Statewide Environmental Assessments Unit, Department of Environment and Heritage Protection
- Mapoon / [edited and written by the IDA team of J. Roberts [and others]]
- Planning for a healthy community, Old Mapoon : a pictorial summary / Marpuna Corporation ... [et al]