Nepean River Green Bridge : bridge design evaluation report
- Bib ID:
- 6337668
- Format:
- Book
- Related Online Resources:
- Access electronic version
Broken link? let us search Trove , the Wayback Machine , or Google for you.
- Description:
-
- [Sydney, New South Wales] : Roads and Maritime Services, April 2013
- 1 volume (various pagings, some folded) : colour illustrations, colour maps ; 30 cm
- ISBN:
- 9781922245403
- Technical Details:
- System requirements: Adobe Acrobat Reader to view pdf file.
- Summary:
-
"In 2010, the NSW State Government made an election commitment to improve cycling and walking connections between Emu Plains and Penrith, by widening the Victoria Bridge over the Nepean River. Roads & Maritime Services (RMS) subsequently evaluated this option and found that upgrading the heritage Victoria Bridge would not be a cost-effective way to achieve the desired outcome ... A number of design options for the bridge crossing have been investigated by RMS Bridge Engineering Section and recognised urban design companies. Five options for the concept design of the bridge are outlined in this report. Each option was reviewed to determine feasibility and constructability. Cost estimates have also been prepared for each option."--Executive summary.
- Full contents:
-
- Bridge Design Evaluation Report
- Appendix A. TfNSW - Traffic and Transport report (Nepean River Green Bridge : transport study)
- Appendix B. Hassell design option (selected images)
- Appendix C. KI Studio design option (selected images)
- Appendix D. CM+ design option (selected images)
- Appendix E. RMS Bridge Engineering Option Cable Stay Bridge (selected images)
- Appendix F. RMS Bridge Engineering Option Steel I Girder Bridge (selected images)
- Appendix G. Community Consultation Submission Report (Nepean River Green Bridge : Submission Report / Sinclair Knight Merz)
- Appendix H. Communication with Rowing Organisations
- Appendix I. Submission from Nepean Rowing Club: compilation of rowing activities on Nepean River at Penrith.
- Notes:
-
- Cover title.
- "April 2013"
- "RMS 13.280".
- Also available online. Address as at 25/06/13 :http://www.rta.nsw.gov.au/roadprojects/projects/sydney_region/western_sydney/nepean_river_green_bridge/project_documents.html
- Subject:
- Other authors/contributors:
- Also Titled:
-
- Nepean River Green Bridge : transport study
- Nepean River Green Bridge : submission report
- Copyright:
-
In Copyright
You may copy under some circumstances, for example you may copy a portion for research or study. Order a copy through Copies Direct to the extent allowed under fair dealing. Contact us for further information about copying.
- Reason for copyright status:
- Until 2063 [Created/Published Date + 50 Years]
Copyright status was determined using the following information:
- Material type:
- Literary Dramatic Musical
- Published status:
- Published
- Publication date:
- 2013
Copyright status may not be correct if data in the record is incomplete or inaccurate. Other access conditions may also apply. For more information please see: Copyright in library collections.
Request this item
Request this item to view in the Library’s reading room.
Feedback
Similar items
- Nepean river green bridge: draft preliminary bridge design options report
- Nepean River Green Bridge : review of environmental factors / Roads and Maritime Services, prepared by nghenvironmental
- Nepean River Green Bridge : submissions report / prepared by nghenvironmental for Roads and Maritime Services
- Nepean River Green Bridge : review of environmental factors : main report and appendices / Roads and Maritime Services, prepared by nghenvironmental
- Ferry on the Nepean near Penrith, N.S.W., August 8th, 1847 [picture] / [Charles Edward Stanley]