Groundwater cleanup plan [electronic resource] / Orica Engineering
- Bib ID:
- 3422558
- Format:
- Book
- Online Access:
- Archived version
- Related Online Resources:
- Publisher site
- Description:
- Melbourne : Orica Engineering, 2003
- Series:
- PANDORA electronic collection.
- Technical Details:
-
- Mode of access: World Wide Web. Available at: http://www.oricabotanygroundwater.com/Clean%20up%20Plan%20Documents/GCP_Final_31102003%5B1%5D.pdf (as of 9/3/2005).
- System requirements: Adobe Acrobat Reader required to view/print PDF files.
- Summary:
-
"The NSW Environmental Protection Agency (EPA) issued Notice of Cleanup Action Notice No 1030236 on Orica on 26 September 2003. In accordance with condition 3B of the notice, Orica has completed a Groundwater Cleanup Plan (GCP) for submission to the Contaminated Sites Section of the EPA for its consideration and approval. In preparing this GCP, it has become even more apparent that the NCUA has set very challenging requirements and time targets for completion of various aspects of remediation activity. Oricas̉ response in this GCP has addressed all issues as completely as practicable in the time available. The response to the NCUA is necessarily complex as there are multiple options that need to be considered, and in many cases parallel implementation of options will be implemented pending key decisions.A fundamental challenge in responding to the GCP is the management of parallel requirements to progress the bioremediation field trials to conclusion (a requirement under the existing Voluntary Investigation and Remediation Agreement [VRA]) whilst meeting the timing constraints of the NCUA and the requirement for use of hydraulic containment and ex situ treatment. The project schedules that is presented is considered indicative only, given the available time and level of definition of the large number of project modules within the GCP Considering the major elements of the NCUA in turn, the following discussion summarises the content of the GCP. This should however be considered in the context of the more detailed discussion in the body of the GCP." --Executive summary
- Notes:
-
- "This document is subject to copyright and is confidential. It must not be reproduced, stored in a retrieval system or transmitted in any form or by any means without the consent of Orica Engineering Pty Ltd".
- Document No: EN1591-00-10-001
- Title from title screen (viewed March 9, 2005).
- References: p. 107
- Selected for archiving
- Subject:
- Other authors/contributors:
- Orica Engineering
- Also Titled:
- Botany Groundwater Project groundwater cleanup plan
- Copyright:
-
In Copyright
You may copy under some circumstances, for example you may copy a portion for research or study. Order a copy through Copies Direct to the extent allowed under fair dealing. Contact us for further information about copying.
- Reason for copyright status:
- Until 2073 [Created/Published Date + 70 Years]
Copyright status was determined using the following information:
- Material type:
- Literary, dramatic or musical work
- Published status:
- Published
- Publication date:
- 2003
Copyright status may not be correct if data in the record is incomplete or inaccurate. Other access conditions may also apply. For more information please see: Copyright in library collections.
Similar items
- Ground water hydrology / by J. R. Watkins
- Ground water
- Water movements near the surface of the earth / by H.T. Ashton
- Data for groundwater model studies
- Les eaux souterraines aux epoques anciennes [microform] : role qui leur revient dans l'origine et les modifications de la substance de l'ecorce terrestre / par A. Daubree