Construction environmental management plan [electronic resource] : project - Eraring Energy Attemperating Reservoir & Pumping Station / Haslin Constructions Pty. Ltd
- Bib ID:
- 4808030
- Format:
- Book
- Online Access:
- Archived version
- Related Online Resources:
- Publisher site
- Edition:
- Edition 1, Revision 1.
- Description:
- [Eraring, N.S.W.?] : [Eraring Energy?], 2008
- Series:
- PANDORA electronic collection
- Technical Details:
-
- Available via World Wide Web. On 5/03/2010 available from website of Eraring Energy at: http://www.eraring-energy.com.au/Default.aspx?aCateId=794.
- System requirements: Acrobat Reader to view/print PDF files.
- Summary:
-
"Overview of Project Objectives: The key objective of the project is to upgrade the infrastructure at EPS to allow the four existing 660 MW generating units to operate at 750 MW. This additional capacity would be used to meet the increasing demands for electricity, particularly during peak periods. A secondary objective of the project is to replace existing components of plant and equipment within the EPS operating units to maintain operational capability as some components are now aging. This replacement/renewal program also aims to improve the efficiency of operations and the environmental and safety performance of EPS."--Introduction.
- Notes:
-
- "Authorised by: Peter Crick".
- "Date: 25th July 2008".
- "Issued for Construction".
- At head of title: Haslin Constructions Pty. Ltd.
- Title from title screen (viewed on 5th March 2010).
- Selected for archiving
- Subject:
- Other authors/contributors:
- Also Titled:
-
- Eraring Attemperating Reservoir and Pumping Station [electronic resource]
- Project - Eraring Attemperating Reservoir and Pumping Station [electronic resource]
- Haslin Constructions Pty. Ltd. environmental management plan
- Copyright:
-
In Copyright
You may copy under some circumstances, for example you may copy a portion for research or study. Order a copy through Copies Direct to the extent allowed under fair dealing. Contact us for further information about copying.
- Reason for copyright status:
- Until 2058 [Created/Published Date + 50 Years]
Copyright status was determined using the following information:
- Material type:
- Literary Dramatic Musical
- Published status:
- Published
- Publication date:
- 2008
Copyright status may not be correct if data in the record is incomplete or inaccurate. Other access conditions may also apply. For more information please see: Copyright in library collections.
Feedback
Similar items
- Environmental assessment for the ash disposal project [electronic resource] / prepared for Eraring Energy [by HLA-Envirosciences Pty Limited]
- Eraring Dam [electronic resource] : preliminary report on hydrology and dam break / GHD [for] Eraring Energy
- Eraring Power Station : environmental impact statement / Electricity Commission of New South Wales
- Habitat offset plan - Eraring Power Station [electronic resource] / [ENSR Australia Pty Ltd for Eraring Energy]
- Eraring's history : farming, monkeys & electricity / Doug Saxon