Draft water plan (Mary Basin) 2023 : performance indicators and water plan objectives : information sheet / Department of Regional Development, Manufacturing and Water
- Bib ID:
- 8809738
- Format:
- Book
- Author:
- Department of Regional Development, Manufacturing and Water, author
- Online Access:
- National edeposit
- Related Online Resources:
- Thumbnail
- Access Conditions:
- National edeposit: Available online
- Description:
-
- [Brisbane, Queensland] : Department of Regional Development, Manufacturing and Water, [2023]
- 1 online resource (5 pages) : colour illustrations, colour charts.
- Series:
- Information sheet.
- Summary:
-
Hydrologic models play a key role for water planning in the Mary Basin. The performance indicators defined in the plan are used to calculate statistics from hydrologic model outputs. These statistics can be analysed against the water plan's environmental flow objectives (EFOs) and water allocation security objectives (WASOs) which set the boundaries for acceptable results. This document details each of the performance indicators that are being used for EFOs and WASOs during the review of the Mary Basin water plan.
- Notes:
- Caption title (viewed on March 14, 2023)
- Subject:
-
- Hydrologic models -- Queensland -- Mary River Watershed
- Stream measurements -- Queensland -- Mary River Watershed
- Watershed management -- Queensland -- Mary River
- Water-supply -- Queensland -- Mary River Valley -- Management
- Earth Sciences, Geography, Environment, Planning
- Hydrologic models
- Stream measurements
- Watershed management
- Water-supply -- Management
- Mary River Watershed (Qld.)
- Queensland -- Mary River Watershed
- Queensland -- Mary River
- Other authors/contributors:
- Queensland. Department of Regional Development, Manufacturing and Water, author
- Terms of Use:
- Licensed under Creative Commons. Attribution 4.0 International (CC BY 4.0)
- Copyright:
-
In Copyright
You may copy under some circumstances, for example you may copy a portion for research or study. Order a copy through Copies Direct to the extent allowed under fair dealing. Contact us for further information about copying.
- Reason for copyright status:
- Until 2073 [Created/Published Date + 50 Years]
Copyright status was determined using the following information:
- Material type:
- Literary Dramatic Musical
- Published status:
- Published
- Publication date:
- 2023
Copyright status may not be correct if data in the record is incomplete or inaccurate. Other access conditions may also apply. For more information please see: Copyright in library collections.
Feedback
Similar items
- Draft water plan (Mary Basin) 2023 : hydrologic assessment : information sheet / Department of Regional Development, Manufacturing and Water
- Draft water plan (Mary Basin) 2023 : management of underground water : information sheet / Department of Regional Development, Manufacturing and Water
- Draft water plan (Mary Basin) 2023 : water licence volumes : information sheet / Department of Regional Development, Manufacturing and Water
- Draft water plan (Mary Basin) 2023 : modernised water entitlements : information sheet / Department of Regional Development, Manufacturing and Water
- Draft water plan (Mary Basin) 2023 : Resource Operations Licences and water supply scheme operations manuals : information sheet / Department of Regional Development, Manufacturing and Water