Draft water plan (Mary Basin) 2023 : hydrologic assessment : information sheet / Department of Regional Development, Manufacturing and Water
- Bib ID:
- 8809781
- Format:
- Book
- Author:
- Department of Regional Development, Manufacturing and Water, author
- Online Access:
- National edeposit
- Related Online Resources:
- Thumbnail
- Access Conditions:
- National edeposit: Available online
- Description:
-
- [Brisbane, Queensland] : Department of Regional Development, Manufacturing and Water, [2023]
- 1 online resource (2 pages)
- Series:
- Information sheet.
- Summary:
-
A hydrologic assessment is one of the technical assessments undertaken to inform the development of a water plan. New surface water hydrologic models for the Mary Basin water plan area have been developed to inform the development of the draft Water Plan (Mary Basin) 2023. The models simulate surface water flows in the Burrum, Mary, Noosa, Maroochy and Mooloolah river basins. This information sheet summarises how hydrologic models are developed and used for water planning.
- Notes:
- Caption title (viewed on March 14, 2023)
- Subject:
-
- Hydrologic models -- Queensland -- Mary River Watershed
- Stream measurements -- Queensland -- Mary River Watershed
- Watershed management -- Queensland -- Mary River
- Water-supply -- Queensland -- Mary River Valley -- Management
- Earth Sciences, Geography, Environment, Planning
- Hydrologic models
- Stream measurements
- Watershed management
- Water-supply -- Management
- Mary River Watershed (Qld.)
- Queensland -- Mary River Watershed
- Queensland -- Mary River
- Other authors/contributors:
- Queensland. Department of Regional Development, Manufacturing and Water, author
- Terms of Use:
- Licensed under Creative Commons. Attribution 4.0 International (CC BY 4.0)
- Copyright:
-
In Copyright
You may copy under some circumstances, for example you may copy a portion for research or study. Order a copy through Copies Direct to the extent allowed under fair dealing. Contact us for further information about copying.
- Reason for copyright status:
- Until 2073 [Created/Published Date + 50 Years]
Copyright status was determined using the following information:
- Material type:
- Literary Dramatic Musical
- Published status:
- Published
- Publication date:
- 2023
Copyright status may not be correct if data in the record is incomplete or inaccurate. Other access conditions may also apply. For more information please see: Copyright in library collections.
Feedback
Similar items
- Draft water plan (Mary Basin) 2023 : performance indicators and water plan objectives : information sheet / Department of Regional Development, Manufacturing and Water
- Draft water plan (Mary Basin) 2023 : management of underground water : information sheet / Department of Regional Development, Manufacturing and Water
- Draft water plan (Mary Basin) 2023 : water licence volumes : information sheet / Department of Regional Development, Manufacturing and Water
- Draft water plan (Mary Basin) 2023 : modernised water entitlements : information sheet / Department of Regional Development, Manufacturing and Water
- Draft water plan (Mary Basin) 2023 : Resource Operations Licences and water supply scheme operations manuals : information sheet / Department of Regional Development, Manufacturing and Water